Mr. Li's private villa indoor swimming pool in Zhongluotan Village, Zhuliao

This swimming pool renovation project was undertaken by our company. It utilizes the most popular domestic and international pool treatment methods, upgrading it into a luxurious pool clubhouse equipped with a sauna and leisure beach chairs. The pool's water surface area is approximately 72 square meters, with a depth of approximately 2 meters and a water capacity of approximately 120 cubic meters. It uses an imported German Ankang copper ion disinfection system, which is easy to maintain and extends the water change cycle.

May 13,2025

Professional consultation on swimming pool equipment Contact: Manager Zuo 13928794545

This project is a swimming pool renovation and upgrade project. The owner built the pool 10 years ago.

However, due to the rudimentary equipment and limited conditions at the time, there was insufficient understanding of swimming pool maintenance and water quality.

There were also no mature water treatment systems available domestically.

 

 

 
Ten years later, the overall structure of the swimming pool remains unchanged, and the owner has a new understanding of the importance of water treatment.
It is no longer a matter of relying on frequent water changes to maintain short swimming times.
 
 

This swimming pool upgrade and renovation project was undertaken by our company, using the most popular swimming pool treatment methods currently available domestically and internationally.

It was upgraded to a luxurious swimming pool club, equipped with a sauna room and leisure beach chairs.

The pool's water surface area is approximately 72 square meters, the water depth is approximately 2 meters, and the water capacity is approximately 120 cubic meters.

Imported German Ankang copper ion disinfection, simple water quality maintenance, and extended water change cycle.